Punchlist Progress
October 23, 2015
- The fence installers began work on the fence between the playground field and the church today.
- Holy Cross signed the contract with Merrick Construction to build the garden pergola.
- The light diffusing panels in the thermal window (above the altar) have been installed.
- All the concrete bollards at the bases of the path lights have been set to ground level.