Last Day of June

Continuing with the Floor

Progress wasn't as rapid as expected and no work crews were here over the weekend to catch up on the tile installation. Here's the progress in the north nave as of this morning.

Our new organ should be delivered and put in the choir loft today. 

The interior marble statues and their pedestals have been positioned to prepare for the arrival of the stone masons (when the fountain base and exterior statue pedestal are ready) and to clear the south nave for the installation of the floor tiles.

IMG_0704
IMG_0704

Yesterday workers installed the conduits for the sprinkler system pipes under the areas where concrete walkways will be poured. 