Pendentives on the Way
Wednesday Evening Adult Faith Meeting Cancelled due to inclement weather.

Tuesday Snow

Work began on the steps into the sanctuary today.

DSCN3810

By the end of the day, a major portion of the North transept ceiling was installed.

DSCN3811

Storeroom above the sanctuary where the old organ was located. The architect proposed it as a room for the altar servers in which to vest. We think we'll use part of the basement for that purpose.

DSCN3813

A winch in the sacristy is attached to a cable in the dome which can be raised or lowered with liturgical items, e.g. our Christmas wreath. The windows facing Ward Avenue have been covered temporarily for their protection from the construction in the room. 

DSCN3812

View from the sanctuary toward the parish field.

DSCN3817
Free again!

DSCN3819

Comments