Construction Progress

DSCN3376
The buttresses need some adjustment

 

DSCN3376
Leaning and twisting just a bit


DSCN3376
Our cross will be removed, regilded with gold and replaced

 

DSCN3376
Southeast transept is coming along

 

DSCN3376
Statue supports for the marble statue of Mary

 

DSCN3376
More stairs were poured. They will be paved with blue stone.

 

DSCN3376
An antique carved angel will be placed under the belvedere in the niche over the main entry door


DSCN3376

DSCN3376
One of my favorite vistas from the St. Helena window

 

DSCN3376
The louvers under each gable will be deep red


DSCN3376


St. John, Mary and Jesus statues off to the Woodworker

Our wooden statues were taken to the woodworker's shop this morning. The crafstmen will do some light restoration work on them and then affix them to the focal point of their new scene, the Crucifixion, the Holy Rood or the Holy Cross. The cross will be newly crafted. Jesus will be affixed to the cross and Mary and St. John look up at him from below. The entire scene will be suspended above the main altar. These three figures have never been displayed before, in fact they are from different continents, but we a hopeful that they will be a beautifully coordinated scene and an occasion of grace here at Holy Cross for many years to com.

Here is the architect's sketch of the design. You may already recognize it as being featured on the hymnal bookplates.

RoodPure


Back to Building

DSCN3318
The barrel vault steel beams will arrive soon and the ceiling will be insulated and closed.
 
DSCN3301
Stairs and handicapped access ramp from courtyard parking. We've taken the leap of faith that we will be able to afford it and have installed the snow melt system.

 

DSCN3301
The cinderblock elevator tower has been sheathed in plywood and will be shingled to match the church


DSCN3301

DSCN3301
Form for concrete pad at transformer

 

DSCN3301
Main Entry Stairs At Southwest narthex. We have also upgraded these stairs from poured concrete to blue stone.

 

DSCN3301
It will be quite a grand entrance when the entryway is complete

 

DSCN3301
Stairway on the South east transept. The niche for the statue of Mary is on the left foreground

 

DSCN3301
Outside stairway to the basement

 

DSCN3301
Almost half the church has drywall installed now

It Was A Beautiful Day

Thanks to everyone who helped out at the parish picnic, to our docents for their expertly conducted guided tours of the church and all the parishioners who came to see the inside of the new church.

21
The weather was picture perfect 21
21 56
56
56
56Everyone got a good look around and a chance to ask questions.

Our Church Tour Guides Get A Tour

Thank you to the group of parishioners who volunteered to be tour guides whom you will meet if you are able to attend our parish picnic.

2014-09-11 16.43.36
It looks good to see parishioners in the church!


2014-09-11 16.43.36
2014-09-11 16.43.36

Change both inside and outside the building are accelerating as we near the completion of the project. Work has been proceeding on the stairways and access ramps with excavation, concrete pouring and laying of concrete block. 

We will be able to enter the church via the old front doors for a walk around the perimeter of the ground floor. The choir loft and basement are off limits, as the metal frames for the stairs have not yet been filled with concrete and the elevator has not been installed.

Come join us for 12 noon mass and the picnic which follows. Sign up for a tour while you spend some relaxing time with fellow parishioners.

 


Parish Feastday This Weekend !

Don't miss this Sunday's Parish Picnic for the Feast of the Exaltation of the Holy Cross! We will begin the celebration with Eucharist at 12 noon and follow with food, fun and games immediately following.

OIL

 

We will also offer tours of the new church to be given by parish volunteers to small groups. It will be a great opportunity to see the inside of the building we have all been watching on the outside for so long.

 


Our Dutch Lectern: The Unboxing

DSCN3274
DSCN3274
DSCN3274

Well, it made the trip from Holland safely and it looks (and smells) great. There's one slight difficulty which is illustrated by the last photograph, which is "life size." Seriously, I thought everyone was short back in the 1890's, especially the Dutch. Some adjustments are in order, or it may be that the lectern will, like the ambo, be located on a lower step than the person using it.