It Was A Beautiful Day
Work Has Begun on Our Main Altar

Back to Building

DSCN3318
The barrel vault steel beams will arrive soon and the ceiling will be insulated and closed.
 
DSCN3301
Stairs and handicapped access ramp from courtyard parking. We've taken the leap of faith that we will be able to afford it and have installed the snow melt system.

 

DSCN3301
The cinderblock elevator tower has been sheathed in plywood and will be shingled to match the church


DSCN3301

DSCN3301
Form for concrete pad at transformer

 

DSCN3301
Main Entry Stairs At Southwest narthex. We have also upgraded these stairs from poured concrete to blue stone.

 

DSCN3301
It will be quite a grand entrance when the entryway is complete

 

DSCN3301
Stairway on the South east transept. The niche for the statue of Mary is on the left foreground

 

DSCN3301
Outside stairway to the basement

 

DSCN3301
Almost half the church has drywall installed now