Construction After the Deluge

Masons had begun work on the elevator shaft on the day before the torrential rains. 

DSCN2510

DSCN2503
From inside the church, the elevator shaft to the left, and the stairwell to the right
DSCN2504
View from the South West Main Entry Door
DSCN2508
Choir Loft from the floor of the nave.
DSCN2507
Sanctuary and site of main altar.

 The pace of the construction project has accelerated somewhat with the coming of warmer weather, but until there is a roof in place, the entire site is subject to weather-related delays --- now not the cold and ice, but the driving winds and rain.

Still on schedule for Christmas 2014.

 