Church Finally Goes Under Cover

There isn't much of it in place yet, but a work crew began sheathing the roof today, screwing the plywood onto the steel trusses. When there is an actual "interior" space in the church, many more work crews can begin their separate tasks.

A delivery of air handling ductwork was received and placed into the basement. The concrete block work for the elevator shaft looks to be complete.

Work continues on the roof over the choir loft and gathering space. 

DSCN2517
A Rim Around the Roof
DSCN2511
Air Handling Ducts (and a Vizsla)
DSCN2514
Elevator Shaft from the First Floor
DSCN2516
The Sky's The Limit