These Bricks Were Made For Walking
Autumn Sunset in Golden Light

Lots of Progress Since Noon Today!

DSCN1607
Basement Floor with Iron Grid and Plastic Membrane in preparation for concrete.

DSCN1609
Closer look. Mens and Ladies Rooms to either side of the column rows and meeting room in the middle.

DSCN1608
Workmen close off the ramp and pour footings before completing the last section of the south basement wall.
DSCN1617
Well, the ramp is closed off. I guess we're using the doorway to get to the basement on Sunday! I think that's either a sump pump pit or the pit for the ejector pump in the foreground.

DSCN1613
Preliminary grading of the ground underneath the north transept which will extend as indicated but not have a basement.

Comments