Elevator Footings and Preparations for Walls
Holy Cross Award to 4A for Mass Attendance this Week

I Can See Clearly Now

 It won't be long before the walls outline the shape of the church, but here is a panorama after today's work. The church outline becomes more apparent with each passing day. 

The northern transept, or the left side of the arm of the cross near the rectory as pictured, will have no basement, so there is a pile of dirt there now where a slab on grade floor will eventually be poured. There is a full basement under the southern transept as can be seen in the photo.

The tallest mound of earth and the ramp into the construction site cover part of the garden and plaza leading up to the main door of the church from the parking lot.

Church Two

 

Comments